The Garaventa CTEC lift will replace a fixed grip lift and access an additional 25 acres of terrain, which will be covered 100 percent with fan gun snowmaking. The total cost of the project will be $3 million.
\
The Garaventa CTEC lift will replace a fixed grip lift and access an additional 25 acres of terrain, which will be covered 100 percent with fan gun snowmaking. The total cost of the project will be $3 million.
\